Test Analyst Log
From OpenEMR Project Wiki
The laboratory Director is required to maintain over quality in a laboratory. This includes verifying that a technician has the background and training to perform the testing required. He/she must then document initial and following training on a particular analyzer. The normal schedule of these events are as follows.
Initial training
3 month follow up
6 month follow up
12 month follow up
annual follow up
signature and initial
- Office Work Flow Main Page
- General Office Visit Work Flow
- The Laboratory
- Xrays
- Billing Cycle