Difference between revisions of "Test Analyst Log"
From OpenEMR Project Wiki
Bradymiller (talk | contribs) m (1 revision: second) |
Bradymiller (talk | contribs) |
||
Line 15: | Line 15: | ||
{{Office Flow}} | {{Office Flow}} | ||
[[Category:Clinic Work Flow]] |
Revision as of 20:39, 4 November 2011
The laboratory Director is required to maintain over quality in a laboratory. This includes verifying that a technician has the background and training to perform the testing required. He/she must then document initial and following training on a particular analyzer. The normal schedule of these events are as follows.
Initial training
3 month follow up
6 month follow up
12 month follow up
annual follow up
signature and initial
- Office Work Flow Main Page
- General Office Visit Work Flow
- The Laboratory
- Xrays
- Billing Cycle