Difference between revisions of "Automatic log-off (MU2)"

From OpenEMR Project Wiki
(Created page with "==Overview== ==MU Requirements== ===Per ONC=== :Taken from [http://www.ofr.gov/OFRUpload/OFRData/2012-20982_PI.pdf ONC Final Rule] <pre> </pre> ==Status== ==Proposal== ==Own...")
 
 
(11 intermediate revisions by 2 users not shown)
Line 3: Line 3:
==MU Requirements==
==MU Requirements==
===Per ONC===
===Per ONC===
:Taken from [http://www.ofr.gov/OFRUpload/OFRData/2012-20982_PI.pdf ONC Final Rule]
:Taken from ONC Final Rule:[[File:2014_Edition_Cert_Federal_Register.pdf]]
<pre>
<pre>
 
(5) Automatic log-off. Prevent a user from gaining further access to an electronic session after a
predetermined time of inactivity.
</pre>
</pre>
===Per ONC/NIST Final Test Methods===
:See here: http://www.healthit.gov/policy-researchers-implementers/2014-edition-final-test-method


==Status==
==Status==
:Tested by Jeyasithar
::*[[File:Automatic_log_off_MU2.zip]]
::*http://sourceforge.net/p/openemr/discussion/202506/thread/d9a759e6#51e1
:Considered finalized by Visolve "Automatic log off comes under gap eligible criteria [Criteria categorized as "Unchanged" between 2011 and 2014 edition], so we don't need to retest this criteria since we doesn't make any change in automatic log off code. Automatic log off doesn't need inspection day testing and everything done via attestation. We can update automatic log off to finalized state in MU2 certification wiki."
::*http://sourceforge.net/p/openemr/discussion/202506/thread/d9a759e6#34ee
:‎[[File:ViSolve_Logo_Small.png|link=http://www.visolve.com/solutions-services/healthcare_services/meaningful-use-consulting-process.php|OpenEMR and EHR Support]] – Meaningful Use Stage 2 Testing of OpenEMR


==Proposal==
==Proposal==


==Owner==
==Owner==
==Forum Threads==
:*[http://sourceforge.net/p/openemr/discussion/202506/thread/d9a759e6 Main Thread]


==Links==
==Links==
:*[[OpenEMR Certification Stage II Meaningful Use|OpenEMR Certification Stage II Meaningful Use Main Project Page]]


[[Category:Certification]][[Category:Certification Stage II]]
[[Category:Certification]][[Category:Certification Stage II]]

Latest revision as of 10:00, 12 January 2014

Overview

MU Requirements

Per ONC

Taken from ONC Final Rule:File:2014 Edition Cert Federal Register.pdf
(5) Automatic log-off. Prevent a user from gaining further access to an electronic session after a
predetermined time of inactivity.

Per ONC/NIST Final Test Methods

See here: http://www.healthit.gov/policy-researchers-implementers/2014-edition-final-test-method

Status

Tested by Jeyasithar
Considered finalized by Visolve "Automatic log off comes under gap eligible criteria [Criteria categorized as "Unchanged" between 2011 and 2014 edition], so we don't need to retest this criteria since we doesn't make any change in automatic log off code. Automatic log off doesn't need inspection day testing and everything done via attestation. We can update automatic log off to finalized state in MU2 certification wiki."
OpenEMR and EHR Support – Meaningful Use Stage 2 Testing of OpenEMR

Proposal

Owner

Forum Threads

Links