Difference between revisions of "Notes from 3-28 Meeting"
From OpenEMR Project Wiki
Bradymiller (talk | contribs) |
Robert Down (talk | contribs) m (moved Notes from 3/28 Meeting to Notes from 3-28 Meeting) |
(No difference)
|
Latest revision as of 04:52, 22 December 2016
PENDING FINAL TESTING
- (a) Computerized provider order entry (core)
- committed and ready for ICSA
- (b) Incorporate laboratory test results (optional)
- ongoing, need a estimate so we can schedule
- (c) Public health surveillance (optional)
completed in previous tests
- (d) Medication reconciliation (optional)
just needs a work flow using scanned document
- (e) Patient specific education resources Need to Document Manual Process (optional)
Sam Bowen needs to document this manual process.